Central Ohio roofing since 1998
Roofs built right the first time.And backed for life.
Three generations of the Hart family have roofed more than 6,400 Central Ohio homes. One crew of our own, no subcontractors, and a foreman who stays on your roof until the last nail is swept.
- Written estimate in 48 hours
- Lifetime workmanship warranty
- 0% financing for 18 months
4.9 average from 612 verified reviews

6,400+
Ohio roofs completed
Request a free estimate
A real person calls you back, usually within the hour.
What we do
Every part of the roof, from the gutters to the ridge vent
Six trades, one crew and one number to call. Pick a service to see exactly what is included and what it costs.
All services

Family owned, three generations
Frank Hart started with one truck and a promise to answer the phone
In 1998 Frank Hart was tired of watching storm chasers leave Columbus homeowners with half finished roofs and disconnected phone numbers. So he started a company that would still be here in twenty years.
Twenty seven years later his daughter Dana runs the office, his grandson Luke leads crew one, and the phone still gets answered by someone who knows your street.
- Every roofer is a Hartline employee, trained in house
- A foreman on site for the whole job, every job
- Drone photo report at every stage
- Yard swept twice with a magnetic nail sweeper
Dana Hart, owner
- Roofs completed
- 0+
- Average review score
- 4.9
- Insurance claims handled
- 0+
- Estimate turnaround
- 0h
What goes into a Hartline roof
Seven layers. You only ever see one of them.
Anyone can nail shingles to a deck. What keeps water out for thirty years is everything underneath. Tap a layer to see what we install and why.
Fig. 1 · Hartline system, exploded
Hand nailed in the manufacturer's high wind pattern. Most crews use four nails. We use six, because that is what the warranty actually requires.
How it works
From first call to final sweep in four steps
Free inspection
A project manager walks the roof, flies the drone and checks the attic. About an hour.
Written estimate
Line by line, in your inbox within 48 hours. Three options, no pressure, no expiry tricks.
Install day
Our own crew, one foreman, most homes finished in a single day. Your yard protected throughout.
Walkthrough and warranty
We walk it together, hand you the photo report and register your warranty the same week.
Recent work
Roofs we finished this season
Roof cost estimator
What will a new roof cost?
A ballpark from real Hartline jobs completed in Central Ohio this year. Your written estimate will be exact.
Your ballpark
$8,300 to $10,200
- Roof size
- 16 sq
- Lifespan
- 30 to 40 yrs
- Per year
- $310
Includes tear off, underlayment, flashing, ventilation, disposal and permits. Excludes decking replacement beyond two sheets.
Reviews
What Columbus says after the dumpster leaves
“Hail took out half the street. Hartline was the only company that got on the roof with the adjuster and argued for the vents and gutters. We paid our deductible and not a cent more.”
4.9 / 5
Average across 612 verified reviews
Storm response
Hail on your street? Here is the next 72 hours.
One project manager handles it all, and you pay your deductible. We never waive it, and anyone who offers to is asking you to commit insurance fraud.
Questions
Straight answers before you sign anything
Still have a question?
Ask the assistant in the corner, or call the office and talk to a real person.
(614) 555-0187From the job site







